A project scheduling and staff assignment model considering learning effect
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
1195 | en_US |
dc.citation.issue |
11-12 | en_US |
dc.citation.spage |
1190 | en_US |
dc.citation.volume |
28 | en_US |
dc.citation.woscount |
22 | |
dc.contributor.author |
Wu, MC | en_US |
dc.contributor.author |
Sun, SH | en_US |
dc.contributor.department |
工業工程與管理學系 | zh_TW |
dc.contributor.department |
Department of Industrial Engineering and Management | en_US |
dc.date.accessioned |
2014-12-08T15:16:41Z | |
dc.date.available |
2014-12-08T15:16:41Z | |
dc.date.issued |
2006-05-01 | en_US |
dc.description.abstract |
In a multi-project environment, we sometimes need to periodically schedule the tasks for each project and assign staff to the tasks. Such a decision-making problem has been studied in literature; however, learning effect of staff has not been considered in previous studies. This research formulates a mixed nonlinear program for project scheduling and staff allocation problems, which considers learning effect of staff. The objective function is to minimize outsourcing costs. A genetic algorithm (GA) is proposed to solve the problem. Experiments for solving various sizes of test problems has been carried out to validate the proposed GA. | en_US |
dc.identifier.doi |
10.1007/s00170-004-2465-0 | en_US |
dc.identifier.issn |
0268-3768 | en_US |
dc.identifier.journal |
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | en_US |
dc.identifier.uri |
http://dx.doi.org/10.1007/s00170-004-2465-0 | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/12303 | |
dc.identifier.wosnumber |
WOS:000236974600020 | |
dc.language.iso |
en_US | en_US |
dc.subject |
genetic algorithm | en_US |
dc.subject |
learning effect | en_US |
dc.subject |
project scheduling | en_US |
dc.subject |
staff allocation | en_US |
dc.title |
A project scheduling and staff assignment model considering learning effect | en_US |
dc.type |
Article | en_US |
檔案
- 000236974600020.pdf (233.7 KB, Adobe PDF)
所屬典藏: 期刊論文
引用此條目
Wu, M., & Sun, S. (2006). A project scheduling and staff assignment model considering learning effect. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 28(11-12), 1190–1195. https://doi.org/10.1007/s00170-004-2465-0
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/12303