标题: Two-machine flowshop batching and scheduling
作者: Lin, BMT
Cheng, TCE
资讯管理与财务金融系
注:原资管所+财金所

Department of Information Management and Finance
关键字: production scheduling;flowshop;batch processing;makespan;strong NP-hardness;lower bound;heuristics
公开日期: 1-一月-2005
摘要: We consider in this paper a two-machine flowshop scheduling problem in which the first machine processes jobs individually while the second machine processes jobs in batches. The forming of each batch on the second machine incurs a constant setup time. The objective is to minimize the makespan. This problem was previously shown to be NP-hard in the ordinary sense. In this paper, we first present a strong NP-hardness result of the problem. We also identify a polynomially solvable case with either anticipatory or non-anticipatory setups. We then establish a property that an optimal solution for the special case is a lower bound for the general problem. To obtain near-optimal solutions for the general problem, we devise some heuristics. The lower bound is used to evaluate the quality of the heuristic solutions. Results of computational experiments reveal that the heuristics produce solutions with small error ratios. They also suggest that the lower bound is close to the optimal solution.
URI: http://dx.doi.org/10.1007/s10479-004-5029-7
http://hdl.handle.net/11536/25452
ISSN: 0254-5330
DOI: 10.1007/s10479-004-5029-7
期刊: ANNALS OF OPERATIONS RESEARCH
Volume: 133
Issue: 1-4
起始页: 149
结束页: 161
显示于类别:Conferences Paper


文件中的档案:

  1. 000227304900009.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.