Due date assignment using artificial neural networks under different shop floor control strategies
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
1745 | en_US |
dc.citation.issue |
9 | en_US |
dc.citation.spage |
1727 | en_US |
dc.citation.volume |
42 | en_US |
dc.citation.woscount |
16 | |
dc.contributor.author |
Hsu, SY | en_US |
dc.contributor.author |
Sha, DY | en_US |
dc.contributor.department |
工業工程與管理學系 | zh_TW |
dc.contributor.department |
Department of Industrial Engineering and Management | en_US |
dc.date.accessioned |
2014-12-08T15:39:15Z | |
dc.date.available |
2014-12-08T15:39:15Z | |
dc.date.issued |
2004-05-01 | en_US |
dc.description.abstract |
Due date assignment (DDA) is the first important task in shop floor control. Due date-related performance is impacted by the quality of the DDA rules. Assigning order due dates and delivering the goods to the customer on time will enhance customer service and provide a competitive advantage. A new methodology for lead-time prediction, artificial neural network (ANN), is adopted to model new due date assignment rules. An ANN-based DDA rule, combined with simulation technology and statistical analysis, is presented. Whether or not the ANN-based DDA rule can outperform the conventional and Reg-based DDA rules taken from the literature is examined. The interactions between the DDA, order review/release (ORR), and dispatching rules significantly impact upon one another, and it is therefore very important to determine a suitable DDA rule for the various combinations of ORR and dispatching rules. From the simulation and statistical results, the ANN-based DDA rules perform better in due date prediction. The ANN-based DDA rules have a smaller tardiness rate than the other rules. ANN-based DDA rules have a better sensitivity and variance. Therefore, if system information is not difficult to obtain, the ANN-based DDA rule can perform a better due date prediction. This paper provides suggestions for DDA rules under various combinations of ORR and dispatching rules. ANN-Sep is suitable for most of these combinations, especially when ORR, workload regulation (WR) and two boundaries (TB), rules are adopted. | en_US |
dc.identifier.doi |
10.1080/00207540310001624375 | en_US |
dc.identifier.issn |
0020-7543 | en_US |
dc.identifier.journal |
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | en_US |
dc.identifier.uri |
http://dx.doi.org/10.1080/00207540310001624375 | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/26804 | |
dc.identifier.wosnumber |
WOS:000220449300003 | |
dc.language.iso |
en_US | en_US |
dc.title |
Due date assignment using artificial neural networks under different shop floor control strategies | en_US |
dc.type |
Article | en_US |
檔案
本條目沒有附加檔案。
所屬典藏: 期刊論文
引用此條目
Hsu, S., & Sha, D. (2004). Due date assignment using artificial neural networks under different shop floor control strategies. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 42(9), 1727–1745. https://doi.org/10.1080/00207540310001624375
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/26804