DISTRIBUTED TASK ASSIGNMENT USING CRITICAL PATH ESTIMATE
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
212 | en_US |
dc.citation.issue |
3 | en_US |
dc.citation.spage |
191 | en_US |
dc.citation.volume |
74 | en_US |
dc.citation.woscount |
1 | |
dc.contributor.author |
HSU, CC | en_US |
dc.contributor.author |
LEE, PJ | en_US |
dc.contributor.department |
資訊科學與工程研究所 | zh_TW |
dc.contributor.department |
Institute of Computer Science and Engineering | en_US |
dc.date.accessioned |
2014-12-08T15:04:17Z | |
dc.date.available |
2014-12-08T15:04:17Z | |
dc.date.issued |
1993-11-01 | en_US |
dc.description.abstract |
A very general task assignment scheme for a distributed computing system is presented in this paper. It takes execution time, communication time, and idle time into consideration. All possible task assignments are formed as a state space tree where a path from the root node of the tree to a node represents a partial or total task assignment. We propose an approach called the critical path overestimate for achieving a suboptimal task assignment and pruning most of the nodes of the tree. Combining the above approach with a divide-and-conquer method, we can further reduce the complexity of the problem, and therefore attain a satisfactory solution. Results from a wide range of experiments reveal that the proposed approaches perform well because of their giving close approximation to the actual cost and saving a high percentage of node generations. | en_US |
dc.identifier.issn |
0020-0255 | en_US |
dc.identifier.journal |
INFORMATION SCIENCES | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/2803 | |
dc.identifier.wosnumber |
WOS:A1993MC65900001 | |
dc.language.iso |
en_US | en_US |
dc.title |
DISTRIBUTED TASK ASSIGNMENT USING CRITICAL PATH ESTIMATE | en_US |
dc.type |
Article | en_US |
檔案
本條目沒有附加檔案。
所屬典藏: 期刊論文