A WIP estimation model for wafer fabrication
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
237 | en_US |
dc.citation.issue |
3 | en_US |
dc.citation.spage |
222 | en_US |
dc.citation.volume |
9 | en_US |
dc.citation.woscount |
1 | |
dc.contributor.author |
Lin, YH | en_US |
dc.contributor.author |
Lee, CE | en_US |
dc.contributor.department |
工業工程與管理學系 | zh_TW |
dc.contributor.department |
Department of Industrial Engineering and Management | en_US |
dc.date.accessioned |
2014-12-08T15:42:01Z | |
dc.date.available |
2014-12-08T15:42:01Z | |
dc.date.issued |
2002-09-01 | en_US |
dc.description.abstract |
The standard WIP (work-in-process) level in wafer fabrication is an important parameter which can be used to diminish system disturbances. This parameter can also be used to trigger the decisions of when to release particular wafer lots and how to dispatch them. This paper not only explores the significance of standard WIP in wafer fabrication, but also presents a method, based on the reorder point (ROP) model, to estimate the standard WIP level in front of each workstation. A numerical example illustrates the method's effectiveness. Also, a simulation model of a real-world wafer fabrication factory in Taiwan is constructed and the wafer input control rule, Fixed-WIP, is applied. Results of a single factor experimental design indicate that the standard WIP level estimated in this study achieves a short mean cycle time and an acceptably high mean throughput rate. The phenomenon, occurring throughout this study, in which a lower WIP level does not guarantee a shorter average cycle time in wafer fabrication, is also explored. Results presented herein demonstrate that the ROP-based WIP estimation method is a highly efficient method in deter-mining a safe and reliable standard WIP level during wafer fabrication. | en_US |
dc.identifier.issn |
1072-4761 | en_US |
dc.identifier.journal |
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/28564 | |
dc.identifier.wosnumber |
WOS:000176533300001 | |
dc.language.iso |
en_US | en_US |
dc.subject |
standard WIP level | en_US |
dc.subject |
reorder point | en_US |
dc.subject |
wafer release | en_US |
dc.subject |
dispatching | en_US |
dc.title |
A WIP estimation model for wafer fabrication | en_US |
dc.type |
Article | en_US |
檔案
本條目沒有附加檔案。
所屬典藏: 期刊論文
引用此條目
Lin, Y., & Lee, C. (2002). A WIP estimation model for wafer fabrication. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 9(3), 222–237. https://ir.lib.nycu.edu.tw/handle/11536/28564
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/28564