Interim equipment shutdown planning for a wafer fab during economic downturns
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
829 | en_US |
dc.citation.issue |
4 | en_US |
dc.citation.spage |
819 | en_US |
dc.citation.volume |
59 | en_US |
dc.citation.woscount |
0 | |
dc.contributor.author |
Chung, Shu-Hsing | en_US |
dc.contributor.author |
Hsieh, Ming-Hsiu | en_US |
dc.contributor.department |
工業工程與管理學系 | zh_TW |
dc.contributor.department |
Department of Industrial Engineering and Management | en_US |
dc.date.accessioned |
2014-12-08T15:47:55Z | |
dc.date.available |
2014-12-08T15:47:55Z | |
dc.date.issued |
2010-11-01 | en_US |
dc.description.abstract |
Because of the low equipment utilization during periods of economic recession, managers of wafer labs are forced to plan equipment shutdowns in order to reduce variable cost and reallocate resources. Unfortunately, few studies have proposed effective solutions for equipment shutdown planning in response to economic downturns. Taking into consideration the product mix, corresponding output target, excessive capacity, production performance impact and the variable cost savings, this paper presents a new mechanism for equipment shutdown planning using a developed integer programming model. The proposed mechanism effectively provides valuable recommendations for the managements of wafer fabs regarding the type and quantity of equipment to shut down. Crown Copyright (C) 2010 Published by Elsevier Ltd. All rights reserved. | en_US |
dc.identifier.doi |
10.1016/j.cie.2010.08.009 | en_US |
dc.identifier.issn |
0360-8352 | en_US |
dc.identifier.journal |
COMPUTERS & INDUSTRIAL ENGINEERING | en_US |
dc.identifier.uri |
http://dx.doi.org/10.1016/j.cie.2010.08.009 | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/31988 | |
dc.identifier.wosnumber |
WOS:000284747000039 | |
dc.language.iso |
en_US | en_US |
dc.subject |
Tool portfolio | en_US |
dc.subject |
Cost reduction | en_US |
dc.subject |
Capacity planning | en_US |
dc.subject |
Semiconductor | en_US |
dc.title |
Interim equipment shutdown planning for a wafer fab during economic downturns | en_US |
dc.type |
Article | en_US |
檔案
- 000284747000039.pdf (535.0 KB, Adobe PDF)
所屬典藏: 期刊論文
引用此條目
Chung, S.-H., & Hsieh, M.-H. (2010). Interim equipment shutdown planning for a wafer fab during economic downturns. COMPUTERS & INDUSTRIAL ENGINEERING, 59(4), 819–829. https://doi.org/10.1016/j.cie.2010.08.009
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/31988