Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
DOI
10.1016/j.disopt.2011.11.001
Abstract
This paper addresses scheduling n jobs in a two-machine flow shop to minimize the total completion time, subject to the condition that the jobs are processed in the same given sequence on both machines. A new concept of optimal schedule block is introduced, and polynomial time dynamic programming algorithms employing this concept are derived for two specific problems. In the first problem, the machine-2 processing time of a job is a step increasing function of its waiting time between the machines, and a decision about machine-1 idle time insertion has to be made. This problem is solved in O(n(2)) time. In the second problem, the jobs are processed in batches and each batch is preceded by a machine-dependent setup time. An O(n(5)) algorithm is developed to find an optimal batching decision. (C) 2011 Elsevier B.V. All rights reserved.