Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
檔案
- 000266146200016.pdf (730.7 KB, Adobe PDF)
日期
2009-11-01
類型
期刊名稱
COMPUTERS & OPERATIONS RESEARCH
卷期與頁次
第 36 卷第 11 期,頁 3031–3040
ISSN
0305-0548
語言
英文
摘要
This paper considers the problem of scheduling a two-stage flowshop that consists of a common critical machine in stage one and two independent dedicated machines in stage two. All the jobs require processing first on the common critical machine. Each job after completing its critical operation in stage one will proceed to the dedicated machine of its type for further processing in stage two. The objective is to minimize the weighted sum of stage-two machine completion times. We show that the problem is strongly NP-hard, and develop an O(n(3)) polynomial time algorithm to solve the special case where the sequences of both types of jobs are given. We also design an approximation algorithm with a tight performance ratio of 4/3 for the general case. (C) 2009 Elsevier Ltd. All rights reserved.
所屬典藏
期刊論文引用此條目
Cheng, T. C. E., Lin, B. M. T., & Tian, Y. (2009). Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times. COMPUTERS & OPERATIONS RESEARCH, 36(11), 3031–3040. https://doi.org/10.1016/j.cor.2009.02.001
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/6483