<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

Scheduling semiconductor in-line steppers in new product/process introduction scenarios

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

DOI

10.1080/00207540802577920

Abstract

This paper presents a scheduling method for an in-line stepper operating in a new process/production introduction (NPI) scenario. An in-line stepper is a bottleneck machine in a semiconductor fab. Its interior is comprised of a series of chambers, while its exterior is a dock equipped with a limited number of ports. The transportation unit for each chamber is a piece of wafer, while that for each port is a job that can contain up to 25 wafers. This transportation incompatibility may lead to an unexpected capacity loss for an in-line stepper - in particular in an NPI scenario that, by nature, includes a substantial number of small-sized jobs. Such a capacity loss can be alleviated by effective scheduling. A genetic algorithm (GA) scheduling method is proposed to enhance the productivity of in-line steppers. Four other sequencing methods are compared with the GA method. Numeric experiments indicate that the GA method outperforms the four benchmarks. The higher the percentage of small-sized jobs, the better the performance of the GA.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By