Title: Minimizing the total machine workload for the wafer probing scheduling problem
Authors: Pearn, WL
Chung, SH
Yang, MH
工業工程與管理學系
Department of Industrial Engineering and Management
Issue Date: 1-Feb-2002
Abstract: The Wafer Probing Scheduling Problem (WPSP) is a practical generalization of the parallel-machine scheduling problem, which has many real-world applications, particularly, in the Integrated Circuit (IC) manufacturing industry. In the wafer probing factories, the jobs are clustered by their product types, which must be processed on groups of identical parallel machines and be completed before the due dates. The job processing time depends on the product type, and the machine setup time is sequentially dependent on the orders of jobs processed. Since the wafer probing scheduling problem involves constraints on job clusters, job-cluster dependent processing time, due dates, machine capacity, and sequentially dependent setup time, it is more difficult to solve than the classical parallel-machine scheduling problem. In this paper, we consider the WPSP and formulate the WPSP as an integer programming problem to minimize the total machine workload. We demonstrate the applicability of the integer programming model by solving a real-world example taken from a wafer probing shop floor in an IC manufacturing factory.
URI: http://dx.doi.org/10.1023/A:1011952232282
http://hdl.handle.net/11536/29032
ISSN: 0740-817X
DOI: 10.1023/A:1011952232282
Journal: IIE TRANSACTIONS
Volume: 34
Issue: 2
Begin Page: 211
End Page: 220
Appears in Collections:Articles


Files in This Item:

  1. 000171291800010.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.