Scheduling in an assembly-type production chain with batch transfer
檔案
- 000241089300002.pdf (211.9 KB, Adobe PDF)
日期
2007-04-01
類型
期刊名稱
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
卷期與頁次
第 35 卷第 2 期,頁 143–151
ISSN
0305-0483
語言
英文
摘要
This paper addresses a three-machine assembly-type flowshop scheduling problem, which frequently arises from manufacturing process management as well as from supply chain management. Machines one and two are arranged in parallel for producing component parts individually, and machine three is an assembly line arranged as the second stage of a flowshop for processing the component parts in batches. Whenever a batch is formed on the second-stage machine, a constant setup time is required. The objective is to minimize the makespan. In this study we establish the strong NP-hardness of the problem for the case where all the jobs have the same processing time on the second-stage machine. We then explore a useful property, based upon which a special case can be optimally solved in polynomial time. We also study several heuristic algorithms to generate quality approximate solutions for the general problem. Computational experiments are conducted to evaluate the effectiveness of the algorithms. (c) 2005 Elsevier Ltd. All rights reserved.
所屬典藏
期刊論文引用此條目
Lin, B. M. T., Cheng, T. C. E., & Chou, A. S. C. (2007). Scheduling in an assembly-type production chain with batch transfer. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 35(2), 143–151. https://doi.org/10.1016/j.omega.2005.04.004
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/10968