On relocation problems with multiple identical working crews
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
379 | en_US |
dc.citation.issue |
4 | en_US |
dc.citation.spage |
366 | en_US |
dc.citation.volume |
3 | en_US |
dc.citation.woscount |
1 | |
dc.contributor.author |
Kononov, A. V. | en_US |
dc.contributor.author |
Lin, B. M. T. | en_US |
dc.contributor.department |
資訊管理與財務金融系 註:原資管所+財金所 | zh_TW |
dc.contributor.department |
Department of Information Management and Finance | en_US |
dc.date.accessioned |
2014-12-08T15:15:20Z | |
dc.date.available |
2014-12-08T15:15:20Z | |
dc.date.issued |
2006-12-01 | en_US |
dc.description.abstract |
The relocation problem was formulated from a public housing project. In its basic form, a set of buildings needed to be torn down and erected by a single working crew. Given a fixed budget, the relocation problem seeks to determine a feasible reconstruction sequence of the old buildings. This problem has been shown to be mathematically equivalent to the classical two-machine flowshop of makespan minimization. In this paper, we consider a variant where multiple working crews are available for the redevelopment project. Most of our results center on the situations where all buildings require the same redevelopment time. We first present a strong NP-hardness proof for the case with two working crews. Then, we give a negative result about the approximability of the studied problem. Approximation algorithms and associated performance-ratio analysis are designed for the cases with unbounded as well as bounded numbers of machines. (c) 2006 Elsevier B.V. All rights reserved. | en_US |
dc.identifier.doi |
10.1016/j.disopt.2006.06.003 | en_US |
dc.identifier.issn |
1572-5286 | en_US |
dc.identifier.journal |
DISCRETE OPTIMIZATION | en_US |
dc.identifier.uri |
http://dx.doi.org/10.1016/j.disopt.2006.06.003 | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/11508 | |
dc.identifier.wosnumber |
WOS:000242965400008 | |
dc.language.iso |
en_US | en_US |
dc.subject |
public housing project | en_US |
dc.subject |
job scheduling | en_US |
dc.subject |
resource constraints | en_US |
dc.subject |
parallel machines | en_US |
dc.subject |
NP-hardness | en_US |
dc.subject |
approximation | en_US |
dc.title |
On relocation problems with multiple identical working crews | en_US |