On relocation problems with multiple identical working crews
檔案
- 000242965400008.pdf (909.9 KB, Adobe PDF)
日期
2006-12-01
類型
期刊名稱
DISCRETE OPTIMIZATION
卷期與頁次
第 3 卷第 4 期,頁 366–379
ISSN
1572-5286
語言
英文
摘要
The relocation problem was formulated from a public housing project. In its basic form, a set of buildings needed to be torn down and erected by a single working crew. Given a fixed budget, the relocation problem seeks to determine a feasible reconstruction sequence of the old buildings. This problem has been shown to be mathematically equivalent to the classical two-machine flowshop of makespan minimization. In this paper, we consider a variant where multiple working crews are available for the redevelopment project. Most of our results center on the situations where all buildings require the same redevelopment time. We first present a strong NP-hardness proof for the case with two working crews. Then, we give a negative result about the approximability of the studied problem. Approximation algorithms and associated performance-ratio analysis are designed for the cases with unbounded as well as bounded numbers of machines. (c) 2006 Elsevier B.V. All rights reserved.