Tool planning in the scenario of multiple existing semiconductor fabs

檔案

日期

2005-11-01

類型

期刊名稱

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY

卷期與頁次

第 27 卷第 1-2 期,頁 145–151

ISSN

0268-3768

語言

英文

摘要

The tool planning problem involves determining how many tools should be allocated to each tool group to achieve a set of objectives. Most previous studies assume that a demand mix has been given for a new factory to be planned. However, when a semiconductor company has several existing fabs, the demand mix for the new fab is not explicitly known, and needs to be allocated from the demand mix of the whole company. This paper presents an integrated approach to determine the optimal demand mix and associated tool plan for the new fab that can minimize the tool cost of the new fab while each fab (new or existing) is requested to meet a predefined target in its mean cycle time. Simulation experiments indicate that the proposed solution is better than that obtained by a heuristic method used in industry. The saving in tool cost for a typical tool planning problem can be over US$ 70 million.

所屬典藏

期刊論文
顯示完整詮釋資料 統計資料

引用此條目

Wu, M., Hsiung, Y., & Hsu, H. (2005). Tool planning in the scenario of multiple existing semiconductor fabs. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 27(1-2), 145–151. https://doi.org/10.1007/s00170-004-2152-1

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://ir.lib.nycu.edu.tw/handle/11536/13144