ESTABLISHING ENGINEERING S-CURVES TO EVALUATE SUPERVISION ENGINEER ALLOCATIONS FOR HIGHWAY CONSTRUCTION PROJECTS
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
902 | en_US |
dc.citation.issue |
7 | en_US |
dc.citation.spage |
890 | en_US |
dc.citation.volume |
22 | en_US |
dc.contributor.author |
Wang, Shih-Hsu | en_US |
dc.contributor.author |
Wang, Wei-Chih | en_US |
dc.contributor.author |
Hsu, Pei-Yuan | en_US |
dc.contributor.author |
Chen, Ci-Hao | en_US |
dc.contributor.author |
Wang, Kun-Chi | en_US |
dc.contributor.department |
土木工程學系 | zh_TW |
dc.contributor.department |
Department of Civil Engineering | en_US |
dc.date.accessioned |
2017-04-21T06:55:46Z | |
dc.date.available |
2017-04-21T06:55:46Z | |
dc.date.issued |
2016 | en_US |
dc.description.abstract |
An engineering consultant firm needs to allocate engineers to supervise a highway construction project in each month during the construction phase. Properly assigning the supervision engineers under a cost-plus-fixed-fee contract has been a key factor affecting the profitability of the firm and the quality assurance of the project. Assigning too many engineers will be a waste, while allocating too few engineers may harm the supervision quality. This work proposes a two-stage model to develop engineering S-curves (called ES-curves) for planning and controlling the engineering supervision schedule. In the planning stage, a predictive ES-curve model is established based on historical ES-curves. In the controlling stage, an ES-curve is built according to the relationships between the engineering progress and construction progress. A cluster analysis and regression analysis are applied to the model development. A case study demonstrates that the produced ES-curves can help management in planning and evaluating when to increase or decrease the number of supervision engineers assigned to a project. | en_US |
dc.identifier.doi |
10.3846/13923730.2014.928363 | en_US |
dc.identifier.issn |
1392-3730 | en_US |
dc.identifier.journal |
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT | en_US |
dc.identifier.uri |
http://dx.doi.org/10.3846/13923730.2014.928363 | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/134174 | |
dc.identifier.wosnumber |
WOS:000380374500005 | en_US |
dc.language.iso |
en_US | en_US |
dc.subject |
S-curve | en_US |
dc.subject |
supervision engineers | en_US |
dc.subject |
resource allocation management | en_US |
dc.subject |
engineering consultant firms | en_US |
dc.subject |
cluster analysis | en_US |
dc.subject |
regression analysis | en_US |
dc.title |
ESTABLISHING ENGINEERING S-CURVES TO EVALUATE SUPERVISION ENGINEER ALLOCATIONS FOR HIGHWAY CONSTRUCTION PROJECTS | en_US |
檔案
本條目沒有附加檔案。
所屬典藏: 期刊論文
引用此條目
Wang, S.-H., Wang, W.-C., Hsu, P.-Y., Chen, C.-H., & Wang, K.-C. (2016). ESTABLISHING ENGINEERING S-CURVES TO EVALUATE SUPERVISION ENGINEER ALLOCATIONS FOR HIGHWAY CONSTRUCTION PROJECTS. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 22(7), 890–902. https://doi.org/10.3846/13923730.2014.928363
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/134174