ESTABLISHING ENGINEERING S-CURVES TO EVALUATE SUPERVISION ENGINEER ALLOCATIONS FOR HIGHWAY CONSTRUCTION PROJECTS

檔案

本條目沒有附加檔案。

至出版者網站查看(DOI) ›

日期

2016

期刊名稱

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT

卷期與頁次

第 22 卷第 7 期,頁 890–902

ISSN

1392-3730

語言

英文

摘要

An engineering consultant firm needs to allocate engineers to supervise a highway construction project in each month during the construction phase. Properly assigning the supervision engineers under a cost-plus-fixed-fee contract has been a key factor affecting the profitability of the firm and the quality assurance of the project. Assigning too many engineers will be a waste, while allocating too few engineers may harm the supervision quality. This work proposes a two-stage model to develop engineering S-curves (called ES-curves) for planning and controlling the engineering supervision schedule. In the planning stage, a predictive ES-curve model is established based on historical ES-curves. In the controlling stage, an ES-curve is built according to the relationships between the engineering progress and construction progress. A cluster analysis and regression analysis are applied to the model development. A case study demonstrates that the produced ES-curves can help management in planning and evaluating when to increase or decrease the number of supervision engineers assigned to a project.

所屬典藏

期刊論文
顯示完整詮釋資料 統計資料

引用此條目

Wang, S.-H., Wang, W.-C., Hsu, P.-Y., Chen, C.-H., & Wang, K.-C. (2016). ESTABLISHING ENGINEERING S-CURVES TO EVALUATE SUPERVISION ENGINEER ALLOCATIONS FOR HIGHWAY CONSTRUCTION PROJECTS. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 22(7), 890–902. https://doi.org/10.3846/13923730.2014.928363

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://ir.lib.nycu.edu.tw/handle/11536/134174