Model for evaluating uncertain project duration considering construction interface problems
檔案
本條目沒有附加檔案。
日期
2014
類型
系所
期刊名稱
APPLIED SCIENCE AND PRECISION ENGINEERING INNOVATION, PTS 1 AND 2
卷期與頁次
第 479-480 卷,頁 1160–+
ISSN
1660-9336
ISBN
978-3-03785-947-6
語言
英文
摘要
Many probabilistic scheduling models have been developed to determine the duration of construction projects. However, these models are not appropriate to capture the effect of the factors that are involved construction interface problems on the durations of multiple activities. This work presents a simulation-based probabilistic scheduling model that includes the impact of construction interface problems on the duration of building projects. The proposed model is established according to an activity duration model and a work-group (WG)-based schedule network. The activity duration model is applied to reflect the effects of "general factors" on the duration of each activity; the WG-based schedule network is employed to evaluate the effects of construction interface problems on the durations of multiple activities. The results of applying the proposed model to an example project reveal that the duration of a project can be over-optimistically estimated if the effects of construction interface problems are neglected.
關鍵詞
Construction interfaceuncertain durationsimulationprobabilistic schedulingschedule risk management網址
所屬典藏
會議論文引用此條目
Wang, S.-H., Lai, Y.-T., Liu, J.-J., & Wang, W.-C. (2014). Model for evaluating uncertain project duration considering construction interface problems. APPLIED SCIENCE AND PRECISION ENGINEERING INNOVATION, PTS 1 AND 2, 479-480, 1160–+. https://doi.org/10.4028/www.scientific.net/AMM.479-480.1160
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/135276