A Royalty Negotiation Model for BOT Projects: A Bi-level Programming Approach
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
+ | en_US |
dc.citation.spage |
1764 | en_US |
dc.citation.woscount |
0 | en_US |
dc.contributor.author |
Kang, Chao-Chung | en_US |
dc.contributor.author |
Feng, Cheng-Min | en_US |
dc.contributor.author |
Kuo, Chiu-Yen | en_US |
dc.contributor.department |
運輸與物流管理系 註:原交通所+運管所 | zh_TW |
dc.contributor.department |
Department of Transportation and Logistics Management | en_US |
dc.date.accessioned |
2017-04-21T06:49:03Z | |
dc.date.available |
2017-04-21T06:49:03Z | |
dc.date.issued |
2008 | en_US |
dc.description.abstract |
This study develops the royalty negotiation model of BOT (Build, operate, and transfer) projects for government and private sector by Bi-level programming approach. There were few studies to explore the royalty negotiation about BOT projects; however, the royalty negotiation is one of many critical negotiation items of concession contract. This study not only develops royalty negotiation model for BOT projects, but also develops the heuristic algorithm for the Bi-level programming problem. The factors of concession rate, time value discount, learn rate and number of negotiation are incorporated into this algorithm. In addition, this paper conducted a case study with the Taipei Port Container Logistic BOT Project by the LINGO and MATLAB programming. Results show that two parties finish the royalty negotiation at the 6th negotiation and the profit index of concessionaire is 1.0621; the government finance recovery rate is 11.689. Therefore, the royalty negotiation model herein developed could be applied to explain the negotiation behavior. | en_US |
dc.identifier.isbn |
978-1-4244-2629-4 | en_US |
dc.identifier.issn |
2157-3611 | en_US |
dc.identifier.journal |
IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3 | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/135649 | |
dc.identifier.wosnumber |
WOS:000269126600355 | en_US |
dc.language.iso |
en_US | en_US |
dc.subject |
BOT | en_US |
dc.subject |
royalty | en_US |
dc.subject |
negotiation | en_US |
dc.subject |
bi-level programming | en_US |
dc.title |
A Royalty Negotiation Model for BOT Projects: A Bi-level Programming Approach | en_US |
dc.type |
Proceedings Paper | en_US |
檔案
本條目沒有附加檔案。
所屬典藏: 會議論文
引用此條目
Kang, C.-C., Feng, C.-M., & Kuo, C.-Y. (2008). A Royalty Negotiation Model for BOT Projects: A Bi-level Programming Approach. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 1764–+. https://ir.lib.nycu.edu.tw/handle/11536/135649
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/135649