This study develops the royalty negotiation model of BOT (Build, operate, and transfer) projects for government and private sector by Bi-level programming approach. There were few studies to explore the royalty negotiation about BOT projects; however, the royalty negotiation is one of many critical negotiation items of concession contract. This study not only develops royalty negotiation model for BOT projects, but also develops the heuristic algorithm for the Bi-level programming problem. The factors of concession rate, time value discount, learn rate and number of negotiation are incorporated into this algorithm. In addition, this paper conducted a case study with the Taipei Port Container Logistic BOT Project by the LINGO and MATLAB programming. Results show that two parties finish the royalty negotiation at the 6th negotiation and the profit index of concessionaire is 1.0621; the government finance recovery rate is 11.689. Therefore, the royalty negotiation model herein developed could be applied to explain the negotiation behavior.

所屬典藏

會議論文
顯示完整詮釋資料 統計資料

引用此條目

Kang, C.-C., Feng, C.-M., & Kuo, C.-Y. (2008). A Royalty Negotiation Model for BOT Projects: A Bi-level Programming Approach. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 1764–+. https://ir.lib.nycu.edu.tw/handle/11536/135649

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://ir.lib.nycu.edu.tw/handle/11536/135649