| 標題: | Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs |
| 作者: | Hung, Hui-Chih Lin, Bertrand M. T. Posner, Marc E. Wei, Jun-Min 工業工程與管理學系 資訊管理與財務金融系 註:原資管所+財金所 Department of Industrial Engineering and Management Department of Information Management and Finance |
| 關鍵字: | Parallel-machine scheduling;Number of tardy jobs;Preemption;Mixed integer program;Heuristic performance analysis |
| 公開日期: | 1-Aug-2019 |
| 摘要: | This paper investigates the classical preemptive parallel-machine scheduling problem of maximizing number of on-time jobs. While the problem is known to be NP-hard, no theoretical analysis of approximation algorithms exists in the literature. As part of the analysis, a new non-standard mixed integer formulation is developed. We propose heuristics based on different design strategies. These heuristics have asymptotically tight relative errors of 1/2. Experimental tests evaluate the computational performance of the procedures. |
| URI: | http://dx.doi.org/10.1007/s10951-018-0584-y http://hdl.handle.net/11536/152186 |
| ISSN: | 1094-6136 |
| DOI: | 10.1007/s10951-018-0584-y |
| 期刊: | JOURNAL OF SCHEDULING |
| Volume: | 22 |
| Issue: | 4 |
| 起始頁: | 413 |
| 結束頁: | 431 |
| Appears in Collections: | Articles |

