Real-Option Valuation of Build- Operate-Transfer Infrastructure Projects under Performance Bonding
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
en_US | |
dc.citation.issue |
5 | en_US |
dc.citation.volume |
140 | en_US |
dc.citation.woscount |
0 | |
dc.contributor.author |
Huang, Yu-Lin | en_US |
dc.contributor.author |
Pi, Chia-Chi | en_US |
dc.contributor.department |
土木工程學系 | zh_TW |
dc.contributor.department |
Department of Civil Engineering | en_US |
dc.date.accessioned |
2014-12-08T15:35:49Z | |
dc.date.available |
2014-12-08T15:35:49Z | |
dc.date.issued |
2014-05-01 | en_US |
dc.description.abstract |
This study assesses the effect of performance bonding on the valuation of a build-operate-transfer (BOT) project by extending the classical Black-Scholes-Merton (BSM) call option model. As common features in BOT contracts, a performance bond is a penalty imposed on concessionaires who exercise contractual rights to terminate participation in a project. In the real-option context, termination rights grant concessionaires the flexibility in managing market uncertainties that can increase the valuation of an infrastructure project, but the penalty impairs this flexibility and reduces valuations. A case study numerically illustrates the BSM model and indicates that performance bonding can destroy the flexibility and project valuations inherent in termination rights even when the penalty is moderate. Balancing performance bonds and termination rights is necessary because both are important in establishing and maintaining long-term contractual relationships in privatized BOT infrastructure projects. | en_US |
dc.identifier.doi |
10.1061/(ASCE)CO.1943-7862.0000821 | en_US |
dc.identifier.issn |
0733-9364 | en_US |
dc.identifier.journal |
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT | en_US |
dc.identifier.uri |
http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000821 | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/24203 | |
dc.identifier.wosnumber |
WOS:000334258200002 | |
dc.language.iso |
en_US | en_US |
dc.subject |
Build | en_US |
dc.subject |
Operate | en_US |
dc.subject |
Transfer | en_US |
dc.subject |
Infrastructure | en_US |
dc.subject |
Private sector | en_US |
dc.subject |
Build-operate-transfer | en_US |
dc.subject |
Performance bond | en_US |
dc.subject |
Real option | en_US |
dc.subject |
Infrastructure privatization | en_US |
dc.subject |
Valuation | en_US |
dc.subject |
Concession contract | en_US |
dc.title |
Real-Option Valuation of Build- Operate-Transfer Infrastructure Projects under Performance Bonding | en_US |
dc.type |
Article | en_US |
檔案
本條目沒有附加檔案。
所屬典藏: 期刊論文
引用此條目
Huang, Y.-L., & Pi, C.-C. (2014). Real-Option Valuation of Build- Operate-Transfer Infrastructure Projects under Performance Bonding. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 140(5). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000821
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/24203