標題: Real-Option Valuation of Build- Operate-Transfer Infrastructure Projects under Performance Bonding
作者: Huang, Yu-Lin
Pi, Chia-Chi
土木工程學系
Department of Civil Engineering
關鍵字: Build;Operate;Transfer;Infrastructure;Private sector;Build-operate-transfer;Performance bond;Real option;Infrastructure privatization;Valuation;Concession contract
公開日期: 1-五月-2014
摘要: This study assesses the effect of performance bonding on the valuation of a build-operate-transfer (BOT) project by extending the classical Black-Scholes-Merton (BSM) call option model. As common features in BOT contracts, a performance bond is a penalty imposed on concessionaires who exercise contractual rights to terminate participation in a project. In the real-option context, termination rights grant concessionaires the flexibility in managing market uncertainties that can increase the valuation of an infrastructure project, but the penalty impairs this flexibility and reduces valuations. A case study numerically illustrates the BSM model and indicates that performance bonding can destroy the flexibility and project valuations inherent in termination rights even when the penalty is moderate. Balancing performance bonds and termination rights is necessary because both are important in establishing and maintaining long-term contractual relationships in privatized BOT infrastructure projects.
URI: http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000821
http://hdl.handle.net/11536/24203
ISSN: 0733-9364
DOI: 10.1061/(ASCE)CO.1943-7862.0000821
期刊: JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
Volume: 140
Issue: 5