Critiquing contractors' scheduling by integrating rule-based and case-based reasoning

檔案

日期

2004-09-01

類型

期刊名稱

AUTOMATION IN CONSTRUCTION

卷期與頁次

第 13 卷第 5 期,頁 665–678

ISSN

0926-5805

語言

英文

摘要

Nowadays, projects involve many activities. Hence, the review process requires the scheduler to be experienced both in field operations and in computer scheduling software. However, the dilemma faced by contractors is that many senior project managers are experienced in the field but not in computers, whereas many young engineers are skilled in computers but not in field operations. This work proposes a generalized framework to represent schedule knowledge, and a computer-based system that analyzes a project schedule and offers corrective advice on potential errors by integrating case-based and rule-based reasoning. (C) 2004 Elsevier B.V. All rights reserved.

所屬典藏

期刊論文
顯示完整詮釋資料 統計資料

引用此條目

Dzeng, R., & Lee, H. (2004). Critiquing contractors' scheduling by integrating rule-based and case-based reasoning. AUTOMATION IN CONSTRUCTION, 13(5), 665–678. https://doi.org/10.1016/j.autcon.2004.03.004

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://ir.lib.nycu.edu.tw/handle/11536/26452