Scheduling semiconductor in-line steppers in new product/process introduction scenarios
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.citation.epage |
1852 | en_US |
dc.citation.issue |
6 | en_US |
dc.citation.spage |
1835 | en_US |
dc.citation.volume |
48 | en_US |
dc.citation.woscount |
6 | |
dc.contributor.author |
Wu, Muh-Cherng | en_US |
dc.contributor.author |
Chiou, Chie-Wun | en_US |
dc.contributor.department |
工業工程與管理學系 | zh_TW |
dc.contributor.department |
Department of Industrial Engineering and Management | en_US |
dc.date.accessioned |
2014-12-08T15:08:00Z | |
dc.date.available |
2014-12-08T15:08:00Z | |
dc.date.issued |
2010 | en_US |
dc.description.abstract |
This paper presents a scheduling method for an in-line stepper operating in a new process/production introduction (NPI) scenario. An in-line stepper is a bottleneck machine in a semiconductor fab. Its interior is comprised of a series of chambers, while its exterior is a dock equipped with a limited number of ports. The transportation unit for each chamber is a piece of wafer, while that for each port is a job that can contain up to 25 wafers. This transportation incompatibility may lead to an unexpected capacity loss for an in-line stepper - in particular in an NPI scenario that, by nature, includes a substantial number of small-sized jobs. Such a capacity loss can be alleviated by effective scheduling. A genetic algorithm (GA) scheduling method is proposed to enhance the productivity of in-line steppers. Four other sequencing methods are compared with the GA method. Numeric experiments indicate that the GA method outperforms the four benchmarks. The higher the percentage of small-sized jobs, the better the performance of the GA. | en_US |
dc.identifier.doi |
10.1080/00207540802577920 | en_US |
dc.identifier.issn |
0020-7543 | en_US |
dc.identifier.journal |
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | en_US |
dc.identifier.uri |
http://dx.doi.org/10.1080/00207540802577920 | en_US |
dc.identifier.uri |
https://ir.lib.nycu.edu.tw/handle/11536/6280 | |
dc.identifier.wosnumber |
WOS:000272988900015 | |
dc.language.iso |
en_US | en_US |
dc.subject |
activity based costing | en_US |
dc.subject |
design of experiments | en_US |
dc.subject |
design for manufacture | en_US |
dc.subject |
availability | en_US |
dc.subject |
capability indices | en_US |
dc.subject |
computer vision | en_US |
dc.subject |
control charts | en_US |
dc.subject |
robotics | en_US |
dc.title |
Scheduling semiconductor in-line steppers in new product/process introduction scenarios | en_US |
dc.type |
Article | en_US |
檔案
- 000272988900015.pdf (674.4 KB, Adobe PDF)
所屬典藏: 期刊論文
引用此條目
Wu, M.-C., & Chiou, C.-W. (2010). Scheduling semiconductor in-line steppers in new product/process introduction scenarios. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 48(6), 1835–1852. https://doi.org/10.1080/00207540802577920
引用文字依 APA 第 7 版格式自動產生,使用前請再核對。
分享
永久網址:https://ir.lib.nycu.edu.tw/handle/11536/6280