Scheduling semiconductor in-line steppers in new product/process introduction scenarios

檔案

日期

2010

類型

期刊名稱

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH

卷期與頁次

第 48 卷第 6 期,頁 1835–1852

ISSN

0020-7543

語言

英文

摘要

This paper presents a scheduling method for an in-line stepper operating in a new process/production introduction (NPI) scenario. An in-line stepper is a bottleneck machine in a semiconductor fab. Its interior is comprised of a series of chambers, while its exterior is a dock equipped with a limited number of ports. The transportation unit for each chamber is a piece of wafer, while that for each port is a job that can contain up to 25 wafers. This transportation incompatibility may lead to an unexpected capacity loss for an in-line stepper - in particular in an NPI scenario that, by nature, includes a substantial number of small-sized jobs. Such a capacity loss can be alleviated by effective scheduling. A genetic algorithm (GA) scheduling method is proposed to enhance the productivity of in-line steppers. Four other sequencing methods are compared with the GA method. Numeric experiments indicate that the GA method outperforms the four benchmarks. The higher the percentage of small-sized jobs, the better the performance of the GA.

所屬典藏

期刊論文
顯示完整詮釋資料 統計資料

引用此條目

Wu, M.-C., & Chiou, C.-W. (2010). Scheduling semiconductor in-line steppers in new product/process introduction scenarios. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 48(6), 1835–1852. https://doi.org/10.1080/00207540802577920

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://ir.lib.nycu.edu.tw/handle/11536/6280