A GA methodology for the scheduling of yarn-dyed textile production
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
DOI
10.1016/j.eswa.2009.04.075
Abstract
This paper presents a scheduling approach for yarn-dyed textile manufacturing. The scheduling problem is distinct in having four characteristics: multi-stage production, sequence-dependent setup times, hierarchical product structure, and group-delivery (a group of jobs pertaining to a particular customer order must be delivered together), which are seldom addressed as a whole in literature. The scheduling objective is to minimize the total tardiness of customer orders. The problem is formulated as a mixed integer programming (MIP) model, which is computationally extensive. To reduce the problem complexity, we decomposed the scheduling problem into a sequence of sub-problems. Each sub-problem is solved by a genetic algorithm (CA), and an iteration of solving the whole sequence of sub-problems is repeated until a satisfactory Solution has been obtained. Numerical experiment results indicated that the proposed approach significantly outperforms the EDD (earliest due date) scheduling method-currently used in the yarn-dyed textile industry. (C) 2009 Elsevier Ltd. All rights reserved.