Browsing by Author "Wang, Shih-Hsu"
Now showing 1 - 8 of 8
- Results Per Page
- Sort Options
Item type:Item, A factor-based probabilistic cost model to support bid-price estimation(2012-04-01) ;Wang, Wei-Chih ;Wang, Shih-Hsu ;Tsui, Yu-Kun ;Hsu, Ching-Hsiang土木工程學系An appropriate bid price is essential for winning a construction project contract. However, making an accurate cost estimate is both time-consuming and expensive. Thus, a method that does not take much time and can approximate a proper bid price can help a contractor in making bid-price decisions when the available bid-estimation time is insufficient. Such a method can also generate a target cost and provide a cross-check for their bid prices that were estimated using a detailed process. This study proposes a novel model for quickly making a bid-price estimation that integrates a probabilistic cost sub-model and a multi-factor evaluation sub-model. The cost sub-model, which is simulation-based, focuses on the cost divisions to save estimation time. At the same time, the multi-factor evaluation sub-model captures the specific factors affecting the cost of each cost division. The advantages of the proposed model are demonstrated by its application to three residential housing projects located in northern Taiwan. The steps for applying this model to other contractors are also provided. (C) 2011 Elsevier Ltd. All rights reserved.Item type:Item, APPLICATION OF IMPORTANCE-SATISFACTION ANALYSIS AND INFLUENCE-RELATIONS MAP TO EVALUATE DESIGN DELAY FACTORS(2014-08-01) ;Wang, Wei-Chih ;Lin, Chia-Li ;Wang, Shih-Hsu ;Liu, Jang-JengLee, Ming-TsungDesign delays can negatively influence the total completion time of a facility construction project. Knowing the factors to which design delays are most sensitive supports the time management of designs. However, factors that cause design delays are several and interrelated. This study proposes a new model to identify key factors that drive design delays. The core of the model integrates importance-satisfaction analysis (ISA) and an influence-relations map (IRM). The ISA evaluates the performance of each delay factor, while the IRM captures the causal relationships among factors. Additionally, the IRM is generated using a decision making trial and evaluation laboratory technique (DEMATEL). The model is applied to a real-world high-tech facility construction project to indicate the strengths of the model. In this investigation, four first-level delay factors and 17 second-level delay sub-factors are derived. The factor of "organization\'s decision making and budget constraints" is identified as the key driver of design delays in the project of interest. The results support management in determining which problem factors should be given priority attention. The proposed model can be employed in other decision-making situations that involve interrelated factors.Item type:Item, Applying building information modeling to support fire safety management(2015-11-01) ;Wang, Shih-Hsu ;Wang, Wei-Chih ;Wang, Kun-Chi ;Shih, Shih-Yu土木工程學系Building information modeling (BIM) is useful in three-dimensional (3D) visualization and data/information storage for planning and maintaining building projects. Recently, researchers globally have been exploring the applications of BIM. In this work, a BIM-based model is designed to support fire safety management of buildings. The model comprises four modules evacuation assessment, escape route planning, safety education, and equipment maintenance. The evacuation assessment module integrates BIM with a Fire Dynamics Simulator to calculate the required safety egress time and the available safety egress time to evaluate the ability to evacuate in case of fire. The escape route planning module utilizes BIM to determine whether the distance of an escape route is acceptable. The safety education module presents hazardous areas, videos of escape routes and directional maps, all in three dimensions, to educate the occupants of the building about fire safety. The equipment maintenance module is implemented in a web-based prototype to support maintenance tasks in a remote management manner. The results of applying BIM have demonstrated that BIM can effectively provide 3D geometric data to support the assessment and planning of fire safety (using the first three modules), and it can store information in support of safety management and property management in a web-based environment (using the equipment maintenance module). (C) 2015 Elsevier B.V. All rights reserved.Item type:Item, ESTABLISHING ENGINEERING S-CURVES TO EVALUATE SUPERVISION ENGINEER ALLOCATIONS FOR HIGHWAY CONSTRUCTION PROJECTS(2016) ;Wang, Shih-Hsu ;Wang, Wei-Chih ;Hsu, Pei-Yuan ;Chen, Ci-HaoWang, Kun-ChiAn engineering consultant firm needs to allocate engineers to supervise a highway construction project in each month during the construction phase. Properly assigning the supervision engineers under a cost-plus-fixed-fee contract has been a key factor affecting the profitability of the firm and the quality assurance of the project. Assigning too many engineers will be a waste, while allocating too few engineers may harm the supervision quality. This work proposes a two-stage model to develop engineering S-curves (called ES-curves) for planning and controlling the engineering supervision schedule. In the planning stage, a predictive ES-curve model is established based on historical ES-curves. In the controlling stage, an ES-curve is built according to the relationships between the engineering progress and construction progress. A cluster analysis and regression analysis are applied to the model development. A case study demonstrates that the produced ES-curves can help management in planning and evaluating when to increase or decrease the number of supervision engineers assigned to a project.Item type:Item, Integrating building information models with construction process simulations for project scheduling support(2014-01-01) ;Wang, Wei-Chih ;Weng, Shao-Wei ;Wang, Shih-Hsu ;Chen, Cheng-Yi土木工程學系Many construction practitioners and researchers have developed four-dimensional (4D) models by linking the three-dimensional (3D) components of a building information model (BIM) with the network activities of a project schedule. In such a 4D model, the BIM provides limited information, except for the 3D components. To enhance the benefits of using BIM in 4D applications, this study proposes an interface system that uses the BIMs ability with regard to quantity takeoffs of required materials (such as steel, forms, and concrete) to support site-level operations simulation, ultimately leading to the generation of a project schedule. Our proposed system includes mechanisms that collect, store, and transfer information among various software packages. Facilitated by the BIM's quantity takeoffs, the operations simulation is able to consider uncertain durations of work tasks, which allows it to consider the competing needs for resources among multiple work tasks, and to evaluate various resource allocation strategies in order to create a suitable construction plan. Finally, the resulting project schedule is also linked to the BIM 3D components, thus producing an improved BIM-based 4D model. (C) 2013 Elsevier B.V. All rights reserved.Item type:Item, Model for evaluating uncertain project duration considering construction interface problems(2014) ;Wang, Shih-Hsu ;Lai, Yu-Ting ;Liu, Jang-Jeng ;Wang, Wei-Chih土木工程學系Many probabilistic scheduling models have been developed to determine the duration of construction projects. However, these models are not appropriate to capture the effect of the factors that are involved construction interface problems on the durations of multiple activities. This work presents a simulation-based probabilistic scheduling model that includes the impact of construction interface problems on the duration of building projects. The proposed model is established according to an activity duration model and a work-group (WG)-based schedule network. The activity duration model is applied to reflect the effects of "general factors" on the duration of each activity; the WG-based schedule network is employed to evaluate the effects of construction interface problems on the durations of multiple activities. The results of applying the proposed model to an example project reveal that the duration of a project can be over-optimistically estimated if the effects of construction interface problems are neglected.Item type:Item, Neuro-Fuzzy Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction(2012-11-01) ;Hsiao, Fan-Yi ;Wang, Shih-Hsu ;Wang, Wei-Chih ;Wen, Chao-Pao土木工程學系Semiconductor hookup construction (i.e., constructing process tool piping systems) is critical to semiconductor fabrication plant completion. During the conceptual project phase, it is difficult to conduct an accurate cost estimate due to the great amount of uncertain cost items. This study proposes a new model for estimating semiconductor hookup construction project costs. The developed model, called FALCON-COST, integrates the component ratios method, fuzzy adaptive learning control network (FALCON), fast messy genetic algorithm (fmGA), and three-point cost estimation method to systematically deal with a cost-estimating environment involving limited and uncertain data. In addition, the proposed model improves the current FALCON by devising a new algorithm to conduct building block selection and random gene deletion so that fmGA operations can be implemented in FALCON. The results of 54 case studies demonstrate that the proposed model has estimation accuracy of 83.82%, meaning it is approximately 22.74%, 23.08%, and 21.95% more accurate than the conventional average cost method, component ratios method, and modified FALCON-COST method, respectively. Providing project managers with reliable cost estimates is essential for effectively controlling project costs.Item type:Item, Quantitative evaluation of the impact of night shifts and alcohol consumption on construction tiling quality(2015-09-01) ;Dzeng, Ren-Jye ;Wang, Shih-Hsu ;Fang, Yi-Cho ;土木工程學系Department of Civil EngineeringThe adverse effects of night-shift work and alcohol consumption on performance have received considerable attention. However, how night shifts and alcohol affect productivity in workers has not been quantified. This paper describes the experiments featuring multiple tiling tasks and patterns. The tiling quality performed by the graduate student participants in four different statuses was objectively evaluated by an edge-detection computer program. The results indicate that both night shift and alcohol significantly reduce the quality in general, and the effects of the factors on position and alignment-angle qualities were dissimilar in distinct areas due to tile patterns and size. Both night-shift and alcohol conditions affected the basic (-34.01% and -25.79%) and advanced tiling abilities (-40.14% and -26.16%), and night shift had a larger impact than alcohol. These results provide jobsite managers with usable information regarding how night shifts and alcohol affect workers\' abilities to execute basic and advanced tasks. (C) 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.