<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

On Constructing Low Power and Robust Clock Tree via Slew Budgeting

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

DOI

Abstract

Clock skew resulted by process variation becomes more and more serious as technology shrinks. In 2010, ISPD held a high performance clock network synthesis contest; it considered supply-voltage variation and wire manufacturing variation. Previous works show that the main issue of variation induced skew is on supply-voltage variation. To trade off power and supply-voltage variation induced skew more effectively, we adapt a tree topology which use a timing model independent symmetrical tree at top level to drive the bottom level non-symmetry trees. Our method gives top tree more power budget to reduce supply-voltage variation induced skew and greedily saves power consuming in bottom level. Experimental results are evaluated from the benchmarks of ISPD contest 2010. Compared with state-of-the-art cross link work, the proposed technique reduces 10% of power consumption on average and also improves the run time.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By