<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

Ground settlement trough due to DOT shield tunneling

dc.citation.epage151en_US
dc.citation.spage147en_US
dc.citation.woscount0en_US
dc.contributor.authorFang, Y. S.en_US
dc.contributor.authorHuang, M. Y.en_US
dc.contributor.authorLiu, C.en_US
dc.contributor.authorKao, C. C.en_US
dc.contributor.department交大名義發表zh_TW
dc.contributor.departmentNational Chiao Tung Universityen_US
dc.date.accessioned2015-07-21T08:30:56Z
dc.date.available2015-07-21T08:30:56Z
dc.date.issued2014-01-01en_US
dc.description.abstractIn this paper, the tunneling with a Double-O-Tube (DOT) shield for the construction of Taoyuan International Airport Access Mass Rapid Transit in Taiwan was introduced. The DOT shield machine and tunneling operation was summarized. Based on the field data, it was found the backfill grouting rate decreased with increasing tunnel depth. This was probably due to: at a deeper location, the pressure to close the tail void was greater, therefore high backfill grouting rate was hard to achieve. Eleven sets of field data collected from six cases indicated that, the maximum settlement due to DOT shield tunneling decreased with increasing tunnel depth. It was also found that the width of settlement trough increased with increasing tunnel depth.en_US
dc.identifier.isbn978-1-315-73895-6; 978-1-138-02700-8en_US
dc.identifier.issnen_US
dc.identifier.journalGEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUNDen_US
dc.identifier.urihttps://ir.lib.nycu.edu.tw/handle/11536/125000
dc.identifier.wosnumberWOS:000350278800023en_US
dc.language.isoen_USen_US
dc.titleGround settlement trough due to DOT shield tunnelingen_US
dc.typeProceedings Paperen_US

Files

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: