Browsing by Author Sha, DY

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 1 to 12 of 12
Issue DateTitleAuthor(s)
1-Sep-1998A common buffer-based approach to buffer management for a wafer fabrication factoryHuang, JY; Sha, DY; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Sep-1998Constructing procedures of an effective production activity control technique for a wafer fabrication environmentHuang, JY; Sha, DY; 工業工程與管理學系; Department of Industrial Engineering and Management
20-Mar-1999A design approach to the multi-objective facility layout problemChen, CW; Sha, DY; 工業工程與管理學系; Department of Industrial Engineering and Management
1-May-2004Due date assignment using artificial neural networks under different shop floor control strategiesHsu, SY; Sha, DY; 工業工程與管理學系; Department of Industrial Engineering and Management
1-May-2004Due-date assignment in wafer fabrication using artificial neural networksSha, DY; Hsu, SY; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Mar-1997Heuristic algorithm for the design of facilities layout and AGV routes in tandem AGV systemsHsieh, LF; Sha, DY; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Mar-1997Heuristic algorithm for the design of facilities layout and AGV routes in tandem AGV systemsHsieh, LF; Sha, DY; 交大名義發表; 工業工程與管理學系; National Chiao Tung University; Department of Industrial Engineering and Management
1-Nov-2005Heuristic approach for solving the multi-objective facility layout problemChen, CW; Sha, DY; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Sep-2003A simulated annealing algorithm for integration of shop floor control strategies in semiconductor wafer fabricationSha, DY; Liu, CY; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jun-2005Using data mining for due date assignment in a dynamic job shop environmentSha, DY; Liu, CH; 工業工程與管理學系; Department of Industrial Engineering and Management
2005Virtual integration with a multi-criteria partner selection model for the multi-echelon manufacturing systemSha, DY; Che, ZH; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jun-2001Wafer rework strategies at the photolithography stageSha, DY; Hsieh, LF; Chen, KJ; 工業工程與管理學系; Department of Industrial Engineering and Management