瀏覽 的方式: 作者 Chung, Yu-Hsiang

跳到: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
或是輸入前幾個字:  
顯示 1 到 10 筆資料,總共 10 筆
公開日期標題作者
1-八月-2012Bi-criteria minimization for the permutation flowshop scheduling problem with machine-based learning effectsChung, Yu-Hsiang; Tong, Lee-Ing; 工業工程與管理學系; Department of Industrial Engineering and Management
1-十一月-2012Genetic algorithms for a two-agent single-machine problem with release timeLee, Wen-Chiung; Chung, Yu-Hsiang; Hu, Mei-Chia; 工業工程與管理學系; Department of Industrial Engineering and Management
1-九月-2011Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerationsChung, Yu-Hsiang; Tong, Lee-Ing; 工業工程與管理學系; Department of Industrial Engineering and Management
1-一月-2013Permutation flowshop scheduling to minimize the total tardiness with learning effectsLee, Wen-Chiung; Chung, Yu-Hsiang; 工業工程與管理學系; Department of Industrial Engineering and Management
1-一月-2013Permutation flowshop scheduling to minimize the total tardiness with learning effectsLee, Wen-Chiung; Chung, Yu-Hsiang; 工業工程與管理學系; Department of Industrial Engineering and Management
1-八月-2013A single-machine bi-criterion scheduling problem with two agentsLee, Wen-Chiung; Chung, Yu-Hsiang; Huang, Zong-Ren; 工業工程與管理學系; Department of Industrial Engineering and Management
2014Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing AgentsLee, Wen-Chiung; Shiau, Yau-Ren; Chung, Yu-Hsiang; Ding, Lawson; 工業工程與管理學系; Department of Industrial Engineering and Management
2010SOLID EARTH DEFORMATION MONITORING USING SATELLITE ALTIMETRY IN SOUTHWESTERN COASTS IN TAIWANCheng, Kai-chien; Hwang, Cheinway; Chung, Yu-Hsiang; Huang, Ching-Yao; Wei, Shiang-Hung; Lee, Hyongki; Shum, C. K.; Kuo, Chung-Yen; 土木工程學系; Department of Civil Engineering
1-一月-2013Two-agent singe-machine scheduling with release times to minimize the total weighted completion timeCheng, T. C. E.; Chung, Yu-Hsiang; Liao, Shan-Ci; Lee, Wen-Chiung; 應用化學系; 工業工程與管理學系; Department of Applied Chemistry; Department of Industrial Engineering and Management
2011具有學習效果的流程式生產排程之最大完工時間與總完工時間最小化之研究鐘愉翔; Chung, Yu-Hsiang; 唐麗英; 洪瑞雲; Tong, Lee-Ing; Horng, Ruey-Yun; 工業工程與管理學系