    SIM-UTILITY: Model for project ceiling price determination
    (2002-01-01)
    Wang, WC
    ;
    土木工程學系
    ;
    Department of Civil Engineering
    Before considering bids submitted by competing contractors for a public procurement project, the owner should determine a project ceiling price or cost estimate to use as a reference point for evaluating the bids. A high ceiling price conflicts with the owner's interests in minimizing costs. Meanwhile, a low ceiling price can jeopardize the project if all bids exceed the ceiling price. This paper proposes a model for determining a reasonable project ceiling price. The model, called SIM-UTILITY, is based on a utility theory and facilitated by a cost simulation approach. The utility theory is applied to reflect the owner's preferences regarding the determination criteria, while the simulation approach is used to generate more objective project cost data to support execution of the utility theory. The advantages of SIM-UTILITY are proven by its successful application to three construction projects in Taiwan. A computerized SIM-UTILITY is expected to be broadly applicable to public construction projects in Taiwan.
  • Item type:Item,
    Module-based construction schedule administration for public infrastructure agencies
    (2004-01-01)
    Dzeng, RJ
    ;
    Wang, WC
    ;
    Tserng, HP
    ;
    土木工程學系
    ;
    Department of Civil Engineering
    Infrastructure projects such as the construction of expressways are often distributed over different regions and must therefore be divided into several tendering packages. The public agencies that administrate such projects manage project packages that must be integrated. All project packages may involve similar work. However, they are carried out by different contractors each with their own scheduling practices. Standardization provides a foundation for more efficient and effective schedule integration, but cannot easily be enforced without objections from contractors. This paper presents a three-stage standardization implementation framework using modularization. A set of network modules that involve normal, repetitive, cyclic, and merging activities was developed for expressway projects. Two computer systems were developed to help contractors use these modules to create schedules, and to help the owner review schedules submitted by contractors. Experiments and a survey were also carried out to validate the proposed framework, demonstrating a significant amount of time saving and errors reduced by using network modules.