    SIM-UTILITY: Model for project ceiling price determination
    (2002-01-01)
    Wang, WC
    ;
    土木工程學系
    ;
    Department of Civil Engineering
    Before considering bids submitted by competing contractors for a public procurement project, the owner should determine a project ceiling price or cost estimate to use as a reference point for evaluating the bids. A high ceiling price conflicts with the owner's interests in minimizing costs. Meanwhile, a low ceiling price can jeopardize the project if all bids exceed the ceiling price. This paper proposes a model for determining a reasonable project ceiling price. The model, called SIM-UTILITY, is based on a utility theory and facilitated by a cost simulation approach. The utility theory is applied to reflect the owner's preferences regarding the determination criteria, while the simulation approach is used to generate more objective project cost data to support execution of the utility theory. The advantages of SIM-UTILITY are proven by its successful application to three construction projects in Taiwan. A computerized SIM-UTILITY is expected to be broadly applicable to public construction projects in Taiwan.
  • Item type:Item,
    Electronic-based procedure for managing unbalanced bids
    (2004-05-01)
    Wang, WC
    ;
    土木工程學系
    ;
    Department of Civil Engineering
    Construction lump sum lowest bid procurement is one of the most prevalent methods of awarding construction contracts. For a lump sum bidding practice in Taiwan, after the lowest bidder is awarded a construction project contract, the contractual unit price for each cost item is taken as the product of the owner's estimated unit price and a discounting ratio equal to the total bid price divided by the owner's project cost estimate. This owner-based approach is inequitable because the bidder is denied the right to allocate the risks associated with the costs of performing the work. In U.S. practice, while the unit prices submitted by the bidder are usually considered as the contractual ones, unbalanced bids may occur. This work presents a bidder-based quantitative procedure, built on an electronic-based bidding process for effectively and efficiently supporting reviewing and adjusting the bidder's proposed unit prices for a lump sum procurement project. The advantages of this procedure include that the unit prices electronically obtained front the owner and all qualified bidders are included in analyses during unit-price evaluation, and that rules for unit-price adjustment along with maintaining the total contractual price are included. The novel procedure has been successfully applied to several construction projects in Taiwan and the results have been greatly appreciated by both governments and contractors.