標題: | A methodology for schedule compression |
作者: | Wu, HH Li, RK 交大名義發表 工業工程與管理學系 National Chiao Tung University Department of Industrial Engineering and Management |
關鍵字: | schedule;schedule graph;schedule compression;Leitstand |
公開日期: | 1-Jul-1996 |
摘要: | A generated schedule can be improved (especially on due date performance) simply by compressing the current schedule to the left. Additionally, two forms of schedule compression are available, i.e. simple compression and complex compression. In practical considerations, however, knowing exactly where the compression effort should be placed so that the schedule can be improved more efficiently is a relatively difficult task. This decision requires an evaluation methodology, which is the primary objective of this study. The evaluation methodology is based on the priority weight computation for those affected operations. The priority weight computation is an integration of sequence effect weight with time effect weight. The priority weight information provides not only where the compression effort should be placed but also the intelligent information of (1) the operations related to the compression effort and (2) the time that job(s) can be packed to the left. Specifics of the schedule compression concepts and algorithms of the evaluation methodology are also discussed. |
URI: | http://hdl.handle.net/11536/1178 |
ISSN: | 0953-7287 |
期刊: | PRODUCTION PLANNING & CONTROL |
Volume: | 7 |
Issue: | 4 |
起始頁: | 407 |
結束頁: | 417 |
Appears in Collections: | Articles |