標題: | Two-stage flow shop scheduling with dedicated machines |
作者: | Lin, Bertrand M. T. 資訊管理與財務金融系 註:原資管所+財金所 Department of Information Management and Finance |
關鍵字: | makespan;maximum lateness;dedicated machine;flow shop scheduling |
公開日期: | 16-二月-2015 |
摘要: | This study is concerned with the manufacturing model that has a common machine at stage one and two parallel dedicated machines at stage two. All jobs need to be processed on the stage-one common machine. After the stage-one processing, the jobs of type 1 (type 2) will route to the first (second) dedicated machine at stage two. We first elaborate several published works on makespan minimisation which are not known to other streams of recent works. While the minimisation of maximum lateness is strongly NP-hard, we develop a linear-time algorithm to solve the case where two sequences of the two job types are given a priori. |
URI: | http://dx.doi.org/10.1080/00207543.2014.944631 http://hdl.handle.net/11536/123845 |
ISSN: | 0020-7543 |
DOI: | 10.1080/00207543.2014.944631 |
期刊: | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH |
Volume: | 53 |
起始頁: | 1094 |
結束頁: | 1097 |
顯示於類別: | 期刊論文 |