完整後設資料紀錄
DC 欄位語言
dc.contributor.authorWang, Wei-Chihen_US
dc.contributor.authorBilozerov, Tymuren_US
dc.contributor.authorDzeng, Ren-Jyeen_US
dc.contributor.authorHsiao, Fan-Yien_US
dc.contributor.authorWang, Kun-Chien_US
dc.date.accessioned2017-04-21T06:56:21Z-
dc.date.available2017-04-21T06:56:21Z-
dc.date.issued2017en_US
dc.identifier.issn1392-3730en_US
dc.identifier.urihttp://dx.doi.org/10.3846/13923730.2014.948908en_US
dc.identifier.urihttp://hdl.handle.net/11536/133222-
dc.description.abstractDuring the conceptual phase of a construction project, numerous uncertainties make accurate cost estimation challenging. This work develops a new model to calculate conceptual costs of building projects for effective cost control. The proposed model integrates four mathematical techniques (sub-models), namely, (1) the component ratios sub-model, fuzzy adaptive learning control network (FALCON) and fast messy genetic algorithm (fmGA) based sub-model, (2) regression sub-model, and (4) multi-factor evaluation sub-model. While the FALCON- and fmGA-based sub-model trains the historical cost data, three other sub-models assess the inputs systematically to estimate the cost of a new project. This study also closely examines the behavior of the proposed model by evaluating two modified models without considering fmGA and undertaking sensitivity analysis. Evaluation results indicate that, with the ability to more thoroughly respond to the project characteristics, the proposed model has a high probability of increasing estimation accuracies more than the three conventional methods, i.e., average unit cost, component ratios, and linear regression methods.en_US
dc.language.isoen_USen_US
dc.subjectconceptual cost estimationen_US
dc.subjectcomponent ratios methoden_US
dc.subjectfuzzy adaptive learning control networken_US
dc.subjectfast messy genetic algorithmen_US
dc.subjectregression methoden_US
dc.subjectmulti-factor evaluationsen_US
dc.subjectbuilding projecten_US
dc.titleCONCEPTUAL COST ESTIMATIONS USING NEURO-FUZZY AND MULTI-FACTOR EVALUATION METHODS FOR BUILDING PROJECTSen_US
dc.identifier.doi10.3846/13923730.2014.948908en_US
dc.identifier.journalJOURNAL OF CIVIL ENGINEERING AND MANAGEMENTen_US
dc.citation.volume23en_US
dc.citation.issue1en_US
dc.citation.spage1en_US
dc.citation.epage14en_US
dc.contributor.department土木工程學系zh_TW
dc.contributor.departmentDepartment of Civil Engineeringen_US
dc.identifier.wosnumberWOS:000394451300001en_US
顯示於類別:期刊論文