Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Ying, Kuo-Ching | en_US |
| dc.contributor.author | Lu, Chung-Cheng | en_US |
| dc.contributor.author | Chen, Jhao-Cheng | en_US |
| dc.date.accessioned | 2017-04-21T06:55:41Z | - |
| dc.date.available | 2017-04-21T06:55:41Z | - |
| dc.date.issued | 2016-08 | en_US |
| dc.identifier.issn | 0360-8352 | en_US |
| dc.identifier.uri | http://dx.doi.org/10.1016/j.cie.2016.05.037 | en_US |
| dc.identifier.uri | http://hdl.handle.net/11536/134103 | - |
| dc.description.abstract | This paper deals with four single-machine scheduling problems (SMSPs) with a variable machine maintenance. The objectives of the four SMSPs are to minimize mean lateness, maximum tardiness, total flow time and mean tardiness, respectively. These four SMSPs are important in the literature and in practice. This study proposes an exact algorithm with the computational complexity O(n(2)) for each of the four SMSPs. In addition to the given jobs, the machine maintenance activity between two consecutive jobs is optimally scheduled. (C) 2016 Elsevier Ltd. All rights reserved. | en_US |
| dc.language.iso | en_US | en_US |
| dc.subject | Scheduling | en_US |
| dc.subject | Variable maintenance | en_US |
| dc.subject | Exact algorithms | en_US |
| dc.title | Exact algorithms for single-machine scheduling problems with a variable maintenance | en_US |
| dc.identifier.doi | 10.1016/j.cie.2016.05.037 | en_US |
| dc.identifier.journal | COMPUTERS & INDUSTRIAL ENGINEERING | en_US |
| dc.citation.volume | 98 | en_US |
| dc.citation.spage | 427 | en_US |
| dc.citation.epage | 433 | en_US |
| dc.contributor.department | 運輸與物流管理系 註:原交通所+運管所 | zh_TW |
| dc.contributor.department | Department of Transportation and Logistics Management | en_US |
| dc.identifier.wosnumber | WOS:000381949800036 | en_US |
| Appears in Collections: | Articles | |

