完整後設資料紀錄
DC 欄位語言
dc.contributor.authorSha, D. Y.en_US
dc.contributor.authorLin, Hsing-Hungen_US
dc.date.accessioned2019-04-02T05:58:48Z-
dc.date.available2019-04-02T05:58:48Z-
dc.date.issued2009-12-01en_US
dc.identifier.issn0268-3768en_US
dc.identifier.urihttp://dx.doi.org/10.1007/s00170-009-1970-6en_US
dc.identifier.urihttp://hdl.handle.net/11536/149850-
dc.description.abstractThe academic approach of single-objective flowshop scheduling has been extended to multiple objectives to meet the requirements of realistic manufacturing systems. Many algorithms have been developed to search for optimal or near-optimal solutions due to the computational cost of determining exact solutions. This paper provides a particle swarm optimization-based multi-objective algorithm for flowshop scheduling. The proposed evolutionary algorithm searches the Pareto optimal solution for objectives by considering the makespan, mean flow time, and machine idle time. The algorithm was tested on benchmark problems to evaluate its performance. The results show that the modified particle swarm optimization algorithm performed better in terms of searching quality and efficiency than other traditional heuristics.en_US
dc.language.isoen_USen_US
dc.subjectPSOen_US
dc.subjectMulti-objectiveen_US
dc.subjectFlowshop schedulingen_US
dc.subjectPareto optimalen_US
dc.titleA particle swarm optimization for multi-objective flowshop schedulingen_US
dc.typeArticleen_US
dc.identifier.doi10.1007/s00170-009-1970-6en_US
dc.identifier.journalINTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGYen_US
dc.citation.volume45en_US
dc.citation.spage749en_US
dc.citation.epage758en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000271420900009en_US
dc.citation.woscount19en_US
顯示於類別:期刊論文