完整後設資料紀錄
DC 欄位語言
dc.contributor.author苏泰盛zh_TW
dc.contributor.author吴靖纯zh_TW
dc.contributor.author黄立雯zh_TW
dc.contributor.authorTai-Sheng Suen_US
dc.contributor.authorChin-Chun Wuen_US
dc.contributor.authorLi-Wen Huangen_US
dc.date.accessioned2019-08-21T01:06:18Z-
dc.date.available2019-08-21T01:06:18Z-
dc.date.issued2018-10-01en_US
dc.identifier.issn1023-9863en_US
dc.identifier.urihttp://hdl.handle.net/11536/152524-
dc.identifier.urihttp://dx.doi.org/10.29416/JMS.201810_25(4).0001-
dc.description.abstract本研究考量新料与回收料混合之再制造系统,并建构一个可能性线性规划模式,提供于可回收再制造系统之模糊环境进行生产决策。模式中考量多零组件、多供应商、多回收商、多料源及多机台等因素。系统中的相关参数是具模糊性,模糊参数可用梯形与三角形可能性分配来表示。本研究应用模糊理论与可能性线性规划来表示目标函数、需求量及二氧化碳排放量的不确定性。我们也提出一个决策模式于可回收再制造系统,模式中考量新料与回收料的混合、物料供应商的采购、二氧化碳的排放量及机台良率等限制,达到最小总成本、前置时间及二氧化碳排放量的目标。此外,我们提出一个模糊目标函数和目标限制式的求解程序,为验证模式的正确性,我们以一个实务案例之数值进行测试,研究结果和建议是适合于生产计画使用。zh_TW
dc.description.abstractThis work uses new and recoverable materials to mix into the remanufacturing systems. It implements a possibilistic linear programming model to provide aid in making production decisions in recyclable remanufacturing systems subject to a fuzzy environment which includes multi-component, multi-vendor, multi-source and multi-machine factors. When the related parameters are imprecise in the systems, both the trapezoidal and triangular possibility distributions are used. This work applies fuzzy theory and possibility linear programming to set the objective function, demand and CO_2 emission uncertainty. We propose a decision making model to consider the procurement of raw materials, new materials and recycled materials mixed into the remanufacturing systems with reference to the restrictions of supplier/vendor capacity, CO_2 emissions and machine yield in order to minimize total cost, lead-time and CO_2 emissions. In addition, we propose a procedure for solving the fuzzy objective functions and fuzzy constraints. To test the adequacy of model, we use a numerical example from a real case study. The results and suggestions can provide a feasible situation for production planning.en_US
dc.language.isozh_TWen_US
dc.publisher国立交通大学zh_TW
dc.publisherNational Chiao Tung Universityen_US
dc.subject再制造系统zh_TW
dc.subject模糊理论zh_TW
dc.subject可能性规划法zh_TW
dc.subject前置时间zh_TW
dc.subject二氧化碳排放量zh_TW
dc.subjectRemanufacturing Systemsen_US
dc.subjectFuzzy Theoryen_US
dc.subjectPossibilistic Linear Programmingen_US
dc.subjectLead-Timeen_US
dc.subjectCO_2 Emissionsen_US
dc.title考量碳排放量、成本与前置时间于再制造系统之批量决策zh_TW
dc.titleLot Sizing for Recoverable Remanufacturing Decisions with Cost, Lead Time and Carbon Dioxide Emissionsen_US
dc.typeCampus Publicationsen_US
dc.identifier.journal管理与系统zh_TW
dc.identifier.journalJournal of Management and Systemen_US
dc.citation.volume25en_US
dc.citation.issue4en_US
dc.citation.spage457en_US
dc.citation.epage491en_US
顯示於類別:管理與系統