標題: | The scheduling for parallel machines with periodic maintenance and setup activities |
作者: | Chung, SH Tai, YT Tsai, PH 工業工程與管理學系 Department of Industrial Engineering and Management |
公開日期: | 2005 |
摘要: | This paper tackled a parallel scheduling problem for identical machines with periodic maintenance and sequence-independent setup times under a hybrid make-to-order (MTO) and make-to-stock (MTS) environment. Such a production environment is apparent in many capital-intensive and highly competitive high-tech industries; for example, the thin-film-transistor liquid-crystal-display (TFT LCD) industry. To fully exploit expensive machines, maximum throughput is the objective with the constraints of meeting the promised customer orders in each planning period. In this paper, the time interval of maintenance period is a constant. Hence, the planning period is set equal to corresponding maintenance period in order to reduce the problem complexity. Under such environment and Lime bucket setting, an integer programming (IP) model is developed to find the optimal production quantity and production sequence for each machine for throughput maximization. Finally, a practical example is given to demonstrate the applicability of the proposed IP model to cell assembly of a LCD factory. |
URI: | http://hdl.handle.net/11536/17949 |
ISBN: | 1-932415-70-X |
期刊: | MSV '05: Proceedings of the 2005 International Conference on Modeling, Simulation and Visualization Methods |
起始頁: | 229 |
結束頁: | 235 |
Appears in Collections: | Conferences Paper |