Full metadata record
DC FieldValueLanguage
dc.contributor.authorCHUNG, SHen_US
dc.date.accessioned2014-12-08T15:03:30Z-
dc.date.available2014-12-08T15:03:30Z-
dc.date.issued1995-03-01en_US
dc.identifier.issn0953-7287en_US
dc.identifier.urihttp://hdl.handle.net/11536/2029-
dc.description.abstractThe operating and manufacturing characteristics of a flexible manufacturing system (FMS) mean that a traditional planning procedure of material requirements planning (MRP) and capacity requirements planning (CRP) cannot be followed. Thus the planning works between the master production schedule and the shop-floor control (SFC) systems are analysed and reassigned to the MRP, CRP and SFC systems. A CRP system designed for FMS is presented in this paper. It determines the requested capacities by carrying out part type selection, batch size determination and process plan selection, and by estimting tool slot requests. If there is insufficient capacity, the CRP system calculates the overtime hours required to complete the production of demand quantity for a specified part type.en_US
dc.language.isoen_USen_US
dc.subjectCAPACITY REQUIREMENTS PLANNING (CRP)en_US
dc.subjectFLEXIBLE MANUFACTURING SYSTEM (FMS)en_US
dc.subjectSHOP FLOOR CONTROLen_US
dc.subjectPRODUCTION PLANNINGen_US
dc.subjectSCHEDULINGen_US
dc.titleTHE DESIGN OF A CAPACITY REQUIREMENTS PLANNING SYSTEM FOR FLEXIBLE MANUFACTURING SYSTEMSen_US
dc.typeArticleen_US
dc.identifier.journalPRODUCTION PLANNING & CONTROLen_US
dc.citation.volume6en_US
dc.citation.issue2en_US
dc.citation.spage124en_US
dc.citation.epage133en_US
dc.contributor.department交大名義發表zh_TW
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentNational Chiao Tung Universityen_US
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:A1995QN17900004-
dc.citation.woscount0-
Appears in Collections:Articles