Title: THE DESIGN OF A CAPACITY REQUIREMENTS PLANNING SYSTEM FOR FLEXIBLE MANUFACTURING SYSTEMS
Authors: CHUNG, SH
交大名義發表
工業工程與管理學系
National Chiao Tung University
Department of Industrial Engineering and Management
Keywords: CAPACITY REQUIREMENTS PLANNING (CRP);FLEXIBLE MANUFACTURING SYSTEM (FMS);SHOP FLOOR CONTROL;PRODUCTION PLANNING;SCHEDULING
Issue Date: 1-Mar-1995
Abstract: The operating and manufacturing characteristics of a flexible manufacturing system (FMS) mean that a traditional planning procedure of material requirements planning (MRP) and capacity requirements planning (CRP) cannot be followed. Thus the planning works between the master production schedule and the shop-floor control (SFC) systems are analysed and reassigned to the MRP, CRP and SFC systems. A CRP system designed for FMS is presented in this paper. It determines the requested capacities by carrying out part type selection, batch size determination and process plan selection, and by estimting tool slot requests. If there is insufficient capacity, the CRP system calculates the overtime hours required to complete the production of demand quantity for a specified part type.
URI: http://hdl.handle.net/11536/2029
ISSN: 0953-7287
Journal: PRODUCTION PLANNING & CONTROL
Volume: 6
Issue: 2
Begin Page: 124
End Page: 133
Appears in Collections:Articles