標題: | Procedure for supplier selection based on C-pm applied to super twisted nematic liquid crystal display processes |
作者: | Pearn, WL Wu, CW Lin, HC 工業工程與管理學系 Department of Industrial Engineering and Management |
公開日期: | 1-七月-2004 |
摘要: | The loss-based process capability index C-pm, sometimes called the Taguchi index, has been proposed to the manufacturing industry as a method to measure process performance. The index C-pm takes into account the targeting degree of the process, which essentially measures process performance based on average process loss. Based on the C-pm index, a mathematically complicated approximation method was developed previously for selecting a subset of processes containing the best supplier from a given set of processes. The present paper implements this method and develops a practical step-by-step procedure to aid supplier selection decisions. The accuracy of the selection method is investigated using a simulation technique. The accuracy study provides useful information about the sample size required for a designated selection power. A two-phase selection procedure is developed to select a better supplier and to examine the magnitude of the difference between the two suppliers. Also investigated is a real-world case on the super twisted nematic liquid crystal display manufacturing process, and it is applied to the selection procedure using actual data collected from the factories to reach a decision in supplier selection. |
URI: | http://dx.doi.org/10.1080/0020754042000203876 http://hdl.handle.net/11536/26600 |
ISSN: | 0020-7543 |
DOI: | 10.1080/0020754042000203876 |
期刊: | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH |
Volume: | 42 |
Issue: | 13 |
起始頁: | 2719 |
結束頁: | 2734 |
顯示於類別: | 期刊論文 |