Full metadata record
DC FieldValueLanguage
dc.contributor.authorPearn, WLen_US
dc.contributor.authorChung, SHen_US
dc.contributor.authorYang, MHen_US
dc.date.accessioned2014-12-08T15:43:00Z-
dc.date.available2014-12-08T15:43:00Z-
dc.date.issued2002-01-01en_US
dc.identifier.issn0953-7287en_US
dc.identifier.urihttp://dx.doi.org/10.1080/09537280110061593en_US
dc.identifier.urihttp://hdl.handle.net/11536/29129-
dc.description.abstractThe wafer probing scheduling problem (WPSP) is a practical generalization of the classical parallel-machine scheduling problem, which has many real-world applications, particularly, in the integrated circuit (IC) manufacturing industry. In this paper, a case study on the WPSP is presented, which is taken from a wafer probing shop floor in an IC manufacturing factory. For the WPSP case investigated, the jobs are clustered by their product types, which are processed on groups of identical parallel machines and must be completed before the due dates. The job processing time depends on the product type, and the machine setup time is sequentially dependent on the orders of jobs processed. The objective in this case is to seek a probing job schedule with minimum total machine workload. Since the WPSP case investigated involves constraints on job clusters, job-cluster dependent processing time, due dates, machine capacity, and sequentially dependent setup time, it is more difficult to solve than the classical parallel-machine scheduling problem. The WPSP is formulated as an integer programming problem and the problem solved using the powerful CPLEX with effective implementation strategies. An efficient solution procedure to solve the WPSP near-optimally is proposed.en_US
dc.language.isoen_USen_US
dc.subjectwafer probingen_US
dc.subjectparallel-machine schedulingen_US
dc.subjectsequence-dependent setup timeen_US
dc.subjectinteger programmingen_US
dc.subjectalgorithmen_US
dc.titleA case study on the wafer probing scheduling problemen_US
dc.typeArticleen_US
dc.identifier.doi10.1080/09537280110061593en_US
dc.identifier.journalPRODUCTION PLANNING & CONTROLen_US
dc.citation.volume13en_US
dc.citation.issue1en_US
dc.citation.spage66en_US
dc.citation.epage75en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000173234800009-
dc.citation.woscount7-
Appears in Collections:Articles


Files in This Item:

  1. 000173234800009.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.