標題: Effects of construction on laterally loaded pile groups
作者: Huang, AB
Hsueh, CK
O'Neill, MW
Chern, S
Chen, C
土木工程學系
Department of Civil Engineering
公開日期: 1-五月-2001
摘要: Full-scale lateral load tests on a group of bored and a group of driven precast piles were carried out as part of a research project for the proposed high-speed rail system in Taiwan. Standard penetration tests, cone penetration tests (CPT), and Marchetti Dilatometer tests (DMT) were performed before the pile installation. The CPT and DMT were also conducted after pile installation. Numerical analyses of the laterally loaded piles were conducted using p-y curves derived from preconstruction and postconstruction DMT and by applying the concept of p multipliers. Comparisons between preconstruction and postconstruction CPT and DMT data and evaluation of the results of computations show that the installation of bored piles softened the surrounding soil, whereas the driven piles caused a densifying effect.
URI: http://dx.doi.org/10.1061/(ASCE)1090-0241(2001)127:5(385)
http://hdl.handle.net/11536/29688
ISSN: 1090-0241
DOI: 10.1061/(ASCE)1090-0241(2001)127:5(385)
期刊: JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING
Volume: 127
Issue: 5
起始頁: 385
結束頁: 397