Title: Mixing macro and micro flowtime estimation model: wafer fab example
Authors: Tseng, TY
Ho, TF
Li, RK
工業工程與管理學系
Department of Industrial Engineering and Management
Issue Date: 20-Jul-1999
Abstract: Accurately predicting the order flowtime for a wafer fab is a critical task. Previous investigations involving flowtime estimation of the regression approach have extensively applied the macro flowtime estimation concept. The 'macro' flowtime estimation concept constructs only one aggregate model to estimate the flowtime as a whole. In contrast, the 'micro' flowtime estimation approach constructs an individual regression model for each stage of operation to estimate its individual flowtime. The cumulative order estimated flowtime is then the sum of the individual estimated operation flowtime. Each approach has its own merits and limitations. Therefore, in this study we examine the feasibility of mixing the macro and micro flowtime estimation models. Comparing the proposed model with a variety of macro and micro models reveals that the mixed macro and micro flowtime estimation model can achieve a balance between flowtime estimation error and model complexity.
URI: http://hdl.handle.net/11536/31200
ISSN: 0020-7543
Journal: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume: 37
Issue: 11
Begin Page: 2447
End Page: 2461
Appears in Collections:Articles


Files in This Item:

  1. 000080748100004.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.