完整后设资料纪录
DC 栏位 | 值 | 语言 |
---|---|---|
dc.contributor.author | 李姿莹 | en_US |
dc.contributor.author | Lee, Chih-Yin | en_US |
dc.contributor.author | 王维志 | en_US |
dc.contributor.author | Wang, Wei-Chih | en_US |
dc.date.accessioned | 2014-12-12T01:20:35Z | - |
dc.date.available | 2014-12-12T01:20:35Z | - |
dc.date.issued | 2008 | en_US |
dc.identifier.uri | http://140.113.39.130/cdrfb3/record/nctu/#GT009570530 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/39912 | - |
dc.description.abstract | 土木建筑常被视为经济发展的重要基础原素,当营建材料的物价上涨时,原规划工程预算便产生不足,致使营造厂商不愿投标,或造成已承揽厂商必须赔钱施作,甚至最后因而无法生存。在公共工程合约内,对物价之涨跌的因应主要透过物价调整之合约条款处理,上涨时订有一定比例的补偿。然在实务上,营造厂对于政府所提出调整机制之参考基准点(即行政院主计处所公布之营造物价指数)常有疑虑,因为根据该基准点所计算出之补助金额与营造厂所实际发生之成本常有极大的差异,故而政府在物价上涨时机时,所提出各种物价调整补贴原则方案经常是美意不足。 本研究的第一个部份为以台电变电所等不同公共工程为例,探讨该物价调整之合理度,换言之,分析补助金额与实际成本确实会因工程规模的大小而造成明显差异,并且探讨这些差异是否可以由政府机关的另案补贴原则来进一步调整。本研究的第二个部份乃针对社区大楼等民间工程,对于营造厂在面临营建物价上涨幅度大时,探讨其所采取的因应措施。这些应因措施包括采取各种替代工法(以利主要材料的用量减少,并增加施工进度)、购买材料时机、方式等。 由于营建材料中,一般以钢筋大宗材料涨跌最大,且以钢筋所占总工程款之金额最大(约10%以上),故本研究主要以钢筋为研究范围。另本研究除主要以实际案例进行分析之外,并辅以文献回顾与专家访谈等研究方法,最后研究成果(包括案例分析与业界经验知识)以汇整表方式呈现,以利业界与后续研究者之参考。 | zh_TW |
dc.description.abstract | Construction and building activities are often considered as a key factor to economic development. The project budget becomes insufficient when construction material costs are increased. As a result, constructors are unwilling to submit tenders; and, constructors will suffer with cost overrun. In the contracts of public construction projects, contractual clauses related to price adjustments are mainly applied to deal with increasing construction material costs. That is, a certain percentage of costs will be compensated when there is an increase of material price. However, in practice, the construction firms, to the reference datum point of adjusting the mechanism that the government puts forward (the construction price index announced in namely the executive organ analytic accounting place) Often have a doubt, because the cost that subsidy amount of money and construction firm calculated out according to this datum point happen actually often has a great difference, so when the government is going through the price rise time, it is often insufficient to propose adjusting and replenishing the principle scheme at various kinds of prices. In the first part of this research, the Taiwan Power and other different public projects are used as examples to discuss the reasonableness of current price-adjustment mechanisms. That is, this part concludes that the compensated costs and actual construction costs are significantly different due to various sizes of project scale. Additionally, this part discuss government’s another compensation principle. The second part of this research focuses on the private projects and investigates contractors' management actions for dealing with increasing construction costs. Such management actions includes using alternative construction methods (e.g., reducing the consumption of the main materials and increasing the construction speed), and looking for appropriate timing to procuring construction materials. Because among the building materials, the biggest ups and downs is on the steel bar material, the biggest amount is also on steel bar business (about or 10% more than). Thus, this research focuses on the steel bar business. Furthermore, the research methodological steps include conducting literature review, investigating case studies, and conducting expert interviews. The main contributions of this research are a set of organized experience and knowledge that can be shared with other researchers and practitioners. | en_US |
dc.language.iso | zh_TW | en_US |
dc.subject | 营建物价 | zh_TW |
dc.subject | 物价调整 | zh_TW |
dc.subject | 营造物价指数 | zh_TW |
dc.subject | 钢筋材料 | zh_TW |
dc.subject | Construction prices | en_US |
dc.subject | price adjustment | en_US |
dc.subject | construction cost indices | en_US |
dc.subject | steel | en_US |
dc.title | 营建物价上涨时物价调整机制与营造商因应措施之案例研究 | zh_TW |
dc.title | Case studies of price-adjustment mechanisms and contractors' management actions for dealing with increasing construction costs | en_US |
dc.type | Thesis | en_US |
dc.contributor.department | 工学院工程技术与管理学程 | zh_TW |
显示于类别: | Thesis |