完整後設資料紀錄
DC 欄位語言
dc.contributor.author林淑媛en_US
dc.contributor.authorLin, Shu-Yuanen_US
dc.contributor.author鄭復平en_US
dc.contributor.authorCheng, Fu-Pingen_US
dc.date.accessioned2014-12-12T01:29:21Z-
dc.date.available2014-12-12T01:29:21Z-
dc.date.issued2009en_US
dc.identifier.urihttp://140.113.39.130/cdrfb3/record/nctu/#GT079616582en_US
dc.identifier.urihttp://hdl.handle.net/11536/42291-
dc.description.abstract鋼筋的施工圖數量計算在建築施工是一種極複雜而費時的工作,以計算機自動化改良其正確性及計算之效率有其必要性,本研究針對樑及柱做施工圖及數量計算自動化研究。 本研究經由鋼筋混凝土設計規範,對於樑及柱之間距進行檢核,如果過密可經由束筋及雙層鋼筋解決間距問題。經由鋼筋座標之計算解決樑柱接頭鋼筋位置衝突的問題,並以3D顯示其相對位置,同時準確決定箍筋大小,再由整體考量可以算出樑柱主筋搭接位置及所需鋼筋長度。zh_TW
dc.description.abstractThe construction drawing and quantity calculation of reinforcing steel in the building is a tedious works. Using computer to calculate these works to increase its accuracy and efficiency is necessary. The goal of this research is establishing an automation system to solve the above problems for girders and columns. This research check the clear space between reinforcing steel according to reinforced concrete design specification. If the space are small than required space of the specification, using bundle bars or two layer steels to solve the problem. Calculating the coordinate of each steel to solve the position confliction between column and girder steel. UsingSketchUp shows steel position of girder-column joints by 3D diagram. Under integrate consideration, decide the position of the splice of steel for columns and girders.en_US
dc.language.isozh_TWen_US
dc.subjectRC建築zh_TW
dc.subjectzh_TW
dc.subjectzh_TW
dc.subject大樑zh_TW
dc.subject自動化zh_TW
dc.subject搭接zh_TW
dc.subjectRC buildingen_US
dc.subjectcolumnen_US
dc.subjectgirderen_US
dc.subjectcomputer programen_US
dc.subjectspliceen_US
dc.title鋼筋混凝土房屋之鋼筋施工圖自動產生與自動化計量系統-柱與大樑zh_TW
dc.titleAutomation of Quantity Calculation and Construction Drawing of Steel in RC Building-Column and Girderen_US
dc.typeThesisen_US
dc.contributor.department土木工程系所zh_TW
顯示於類別:畢業論文


文件中的檔案:

  1. 658201.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。