Full metadata record
DC FieldValueLanguage
dc.contributor.authorPearn, W. L.en_US
dc.contributor.authorTai, Y. T.en_US
dc.contributor.authorChiang, W. L.en_US
dc.date.accessioned2014-12-08T15:07:06Z-
dc.date.available2014-12-08T15:07:06Z-
dc.date.issued2010-04-01en_US
dc.identifier.issn1521-334Xen_US
dc.identifier.urihttp://dx.doi.org/10.1109/TEPM.2009.2038994en_US
dc.identifier.urihttp://hdl.handle.net/11536/5564-
dc.description.abstractRecently, the technology of gold bumping has become more popular due to high demand for LCD driver ICs. The requirement of higher resolution application, however, will increase the difficulties for manufacturing the gold bumps due to their high pin counts. For gold bumping processes, bump height is one of the key parameters to control process yield. In reality, some inevitable process variations and shifts regarding the bump height may occur under dynamic manufacturing environment. Conventionally, manufacturing yield for gold bumping processes is calculated under the assumption that the processes are stable. In practice, however, the processes are dynamic, particularly, in the operation of Au-plating in gold bumping factories. To obtain accurate measure of the manufacturing yield, we present a capability index method for manufacturing yield calculation with dynamic variance change considerations. Using this method, the magnitude of the undetected variance change, which is function of the detection power of the chart, is incorporated into the adjusted calculation of manufacturing yield. The detection powers of the chart under various subgroup sizes are tabulated. For illustration purposes, a real application in a gold bumping factory which is located in the Science-based Industrial Park in Hsinchu, Taiwan, is presented.en_US
dc.language.isoen_USen_US
dc.subjectGold bumpingen_US
dc.subjectdynamic variance changeen_US
dc.subjectmanufacturing stability controlen_US
dc.subjectmanufacturing yielden_US
dc.titleMeasuring Manufacturing Yield for Gold Bumping Processes Under Dynamic Variance Changeen_US
dc.typeArticleen_US
dc.identifier.doi10.1109/TEPM.2009.2038994en_US
dc.identifier.journalIEEE TRANSACTIONS ON ELECTRONICS PACKAGING MANUFACTURINGen_US
dc.citation.volume33en_US
dc.citation.issue2en_US
dc.citation.spage77en_US
dc.citation.epage83en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000276270800001-
dc.citation.woscount3-
Appears in Collections:Articles


Files in This Item:

  1. 000276270800001.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.