完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.author | 孫士雄 | en_US |
dc.contributor.author | Shih-Hsiung Sun | en_US |
dc.contributor.author | 巫木誠 | en_US |
dc.contributor.author | Muh-Cherng Wu | en_US |
dc.date.accessioned | 2014-12-12T02:11:16Z | - |
dc.date.available | 2014-12-12T02:11:16Z | - |
dc.date.issued | 2003 | en_US |
dc.identifier.uri | http://140.113.39.130/cdrfb3/record/nctu/#GT009133517 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/57379 | - |
dc.description.abstract | 在一多專案的環境裡,可能需要定期重新指派人力至各專案中的工作項目。學習效應可說明當專案人員被指派到某一工作項目時,人員處理工作的效率會有所提昇,此效應常發生在多個專案的執行期間中,但在過去的研究裡並未針對此一問題深入探討。本研究針對多專案的情境下,考慮學習效應建構一人員指派模型。此非線性數量模型之目標是求得最低外包人員成本,並透過基因演算法之協助來求解,驗證在不同情境組合下求解所需時間。 | zh_TW |
dc.description.abstract | In a multi-project environment, we may need to periodically reassign the staffs to the tasks of each project. Learning effect denotes that a staff member would perform better if he has been assigned to a particular task as possible. This effect usually occurs in the implementation of multi-projects, yet was rarely concerned in previous literature. This research aims to formulate the staff assignment problem for a multi-project scenario with learning effects. A nonlinear mathematic model for minimizing the staff outsourcing cost has been proposed and solved by a genetic algorithm. Experiments for solving various size of test problems has been carried out for justifying the propose method. | en_US |
dc.language.iso | zh_TW | en_US |
dc.subject | 多專案環境 | zh_TW |
dc.subject | 學習效應 | zh_TW |
dc.subject | 指派模式 | zh_TW |
dc.subject | 基因演算法 | zh_TW |
dc.subject | Multi-Project Environment | en_US |
dc.subject | Learning Effect | en_US |
dc.subject | Assignment Model | en_US |
dc.subject | Genetic Algorithm | en_US |
dc.title | 專案人員在學習效應下之指派模式 | zh_TW |
dc.title | A Project Staff Assignment Model Considering Learning Effect | en_US |
dc.type | Thesis | en_US |
dc.contributor.department | 工業工程與管理學系 | zh_TW |
顯示於類別: | 畢業論文 |